The SMG (Sidi Marzoug) concession is located in Central Tunisia and is shared between ETAP (50%) and Mazarine Energy Tunisia (50%), with Mazarine Energy as operator.
The SMG-1 well was successfully tested in 2019 and brought onstream on 7 October 2021, following publication in the Official Gazette.
Read the SMG-1 well onstream announcement, published on 26 October 2021.